Search

  • Select Article Type
  • Abstract Supplements
  • Blood Group Review
  • Call to Arms
  • Hypothesis
  • In Memoriam
  • Interview
  • Introduction
  • Letter to the Editor
  • Short Report
  • abstract
  • Abstracts
  • Article
  • book-review
  • case-report
  • case-study
  • Clinical Practice
  • Commentary
  • Conference Presentation
  • conference-report
  • congress-report
  • Correction
  • critical-appraisal
  • Editorial
  • Editorial Comment
  • Erratum
  • Events
  • Letter
  • Letter to Editor
  • mini-review
  • minireview
  • News
  • non-scientific
  • Obituary
  • original-paper
  • original-report
  • Original Research
  • Pictorial Review
  • Position Paper
  • Practice Report
  • Preface
  • Preliminary report
  • Product Review
  • rapid-communication
  • Report
  • research-article
  • Research Communicate
  • research-paper
  • Research Report
  • Review
  • review -article
  • review-article
  • review-paper
  • Review Paper
  • Sampling Methods
  • Scientific Commentary
  • short-communication
  • short-report
  • Student Essay
  • Varia
  • Welome
  • Select Journal
  • Architecture Civil Engineering Environment

 

Article | 27-August-2018

DISPLACEMENTS OF CABLE-STAYED BRIDGE MEASURED WITH THE USE OF TRADITIONAL AND MODERN TECHNIQUES

The paper describes an experiment involving a comparison of a few selected techniques for measuring the displacements of points on the span and pylon of the large cable-stayed bridge. It presents the measuring equipment and the process of static and dynamic tests. The results obtained from several measuring methods including the interferometric radar were compared and summarised. The experiment showed that in the case of large bridges, like tested cable-stayed structure, the best method is non

Marek SALAMAK, Tomasz OWERKO, Piotr ŁAZIŃSKI

Architecture, Civil Engineering, Environment, Volume 9 , ISSUE 4, 89–97

Research Article | 08-February-2019

STRUCTURAL HEALTH MONITORING SYSTEM OF A CONCRETE CABLE-STAYED BRIDGE

Abstract In this paper a system of the Rędziński bridge will be described. The Rędziński bridge is the biggest object along the A8 motorway around the city of Wrocław and the biggest concrete cable-stayed bridge in Poland. For the purposes of the bridge monitoring a system of 222 sensors was installed. Results from the first 5 years of work of the SHM will be presented below.

Jan BILISZCZUK, Paweł HAWRYSZKÓW, Marco TEICHGRAEBER

Architecture, Civil Engineering, Environment, Volume 11 , ISSUE 4, 69–77

No Record Found..
Page Actions